Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UPDATE: “Kari Hege” to Dredge Wells Port
Business & Finance

September 25, 2014 · about 12 years ago

UPDATE: “Kari Hege” to Dredge Wells Port

The Port of Wells dredging project is scheduled for Monday, September 29, 2014. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 2 and 4. All material dredged from these areas will be placed on the berm which is marked by

1 minutes read
  • LinkedIn
  • X
  • Email

The Port of Wells dredging project is scheduled for Monday, September 29, 2014.

The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 2 and 4.

All material dredged from these areas will be placed on the berm which is marked by the port hand channel buoys.

The locations which will be dredged are dictated by the regular survey results.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free