Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Steel Cut for New GLDD Dredger
Business & Finance

September 29, 2014 · about 12 years ago

Steel Cut for New GLDD Dredger

Great Lakes Dredge & Dock Company, LLC, and Eastern Shipbuilding Group, Inc. (ESG) have started construction of a new Trailing Suction Hopper Dredge ATB. The steel cutting ceremony of the 433’ Trailing Suction Hopper Dredge Barge took place in Eastern’s under roof pre-fabrication building at its All

2 minutes read
  • LinkedIn
  • X
  • Email

Great Lakes Dredge & Dock Company, LLC, and Eastern Shipbuilding Group, Inc. (ESG) have started construction of a new Trailing Suction Hopper Dredge ATB.

The steel cutting ceremony of the 433’ Trailing Suction Hopper Dredge Barge took place in Eastern’s under roof pre-fabrication building at its Allanton facility in Panama City, Florida, on September 15, 2014. This indoor facility supports both of Eastern’s new construction facilities with state of the art equipment and a highly skilled workforce.

During the ceremony, Brian D’Isernia, President of Eastern Shipbuilding Group , stated: “ Great Lakes earlier this year became our newest client. This day represents the start of construction for the Dredge Barge ATB and is another step in continuing our strong commitment to not only this project and but also our long history of being a successful, diversified shipbuilder in the marine industry.”

The detailed engineering for the vessel, named the “Ellis Island” (ESG Hull 253), is being performed by Bay Engineering, Inc., which is based upon an Ocean Tug & Barge Engineering, Inc. ATB design.

Great Lakes new ATB hopper dredge will be a key tool in performing the restoration of the eroded land mass in the Gulf Coast States.

Additionally, the vessel’s ability to cost-effectively deepen and maintain navigable waterways will bolster the United States’ competitive position in world trade, as the nation’s ports move forward with deepening plans to accommodate the larger vessels, which will sail through the expanded Panama Canal.

Delivery of the dredging vessel is scheduled for 2016.

[mappress]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago