Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›World Bora Christened at Port of Esbjerg
Offshore Wind

October 3, 2014 · about 12 years ago

World Bora Christened at Port of Esbjerg

The new next generation support vessel of Danish support vessel operator World Marine Offshore was christened World Bora by Mrs Vanessa Bauch at the naming ceremony today at the port of Esbjerg. The vessel was built at Fjellstrand, a Norwegian shipbuilding yard outside Bergen. The innovative and adv

2 minutes read
  • LinkedIn
  • X
  • Email

The new next generation support vessel of Danish support vessel operator World Marine Offshore was christened World Bora by Mrs Vanessa Bauch at the naming ceremony today at the port of Esbjerg.

The vessel was built at Fjellstrand, a Norwegian shipbuilding yard outside Bergen. The innovative and advanced vessel has a length of 30 m, 13 m in the beam a cruising speed of 22 knots. The vessel is approved By Danish Maritime Authorities and DNVGL as a Passenger vessel for 24 technicians and has accommodation facilities for 5 crew members, so the vessel can remain at sea for several weeks.

The generous deck space made possible by the hull’s ample load capacity ensures that the vessels can load up to 20 tons as well as serving the industry during installation and repair periods, when larger equipment is needed. Four engine installations powering two controllable pitch propellers ensure redundancy and flexibility to the operation. The vessel will be equipped with ballasting systems to shift between rough weather SWATH mode and light weight transit mode. This, in combination with an integrated stabilizing foil, ensures a robust hull with low maintenance costs. The vessel can work in upto 3 m Hs Waves, which will increase accessibility to the Offshore Turbines. The sister vessel will be delivered on the 20th October from the yard and are still uncommitted but a contract are expected to be in place in the next weeks.

World Bora will commence a long term contract with Siemens for crew and cargo transfers at various offshore windfarms in Germany.

Commenting on the delivery, Lars Christian Zøhner, Chief Executive Officer,World Marine Offshore, said: “In terms of quality she looks to be the finest, with superb facilities on-board for our crews and clients. Both the Fjellstrand and World Marine Offshore project teams have raised the bar yet again and this shows both companies commitment to continuous learning.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindPorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free