Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Dutch-Danish Subsea Interconnector Developers Seek Contractors
Offshore Wind

October 20, 2014 · about 12 years ago

Dutch-Danish Subsea Interconnector Developers Seek Contractors

The Dutch and Danish Transmission System Operators (TSOs), TenneT and Energinet.dk, plan to build a power link (interconnector) between Endrup in Denmark and Eemshaven in The Netherlands. For this purpose, the TSOs have announced a call for tenders for a submarine and underground cable system consis

1 minutes read
  • LinkedIn
  • X
  • Email

The Dutch and Danish Transmission System Operators (TSOs), TenneT and Energinet.dk, plan to build a power link (interconnector) between Endrup in Denmark and Eemshaven in The Netherlands.

For this purpose, the TSOs have announced a call for tenders for a submarine and underground cable system consisting of design, engineering, procurement, manufacturing, installation, commissioning and maintenance.

The power interconnector, named COBRAcable, will allow the integration of more renewable energy into the European power grid through the Dutch and Danish power systems and will increase security of power supply.

The connection will be constructed as a High-Voltage Direct Current (HVDC) cable, since the use of DC technology minimizes transmission losses over long distances. The expectation is that the contracts will be awarded in late 2015, followed by the start of construction work in 2016, and completion of the cable in early 2019.

[mappress mapid=”14494″]

Offshore WIND Staff; Image: TenneT (Inside the converter station (Eemshaven) of TenneT’s NordNed cable)

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & FinanceStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free