Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›InterMoor supports Red Hawk spar decommissioning
Fossil Energy

October 30, 2014 · about 12 years ago

InterMoor supports Red Hawk spar decommissioning

InterMoor, an Acteon company, has successfully completed its contract supporting the decommissioning of Anadarko Petroleum Corporation’s Red Hawk spar in the Gulf of Mexico. The Red Hawk spar is the deepest floating production platform to date to be decommissioned in the Gulf of Mexico. It is also t

2 minutes read
  • LinkedIn
  • X
  • Email

InterMoor, an Acteon company, has successfully completed its contract supporting the decommissioning of Anadarko Petroleum Corporation’s Red Hawk spar in the Gulf of Mexico.

The Red Hawk spar is the deepest floating production platform to date to be decommissioned in the Gulf of Mexico. It is also the first spar decommissioned in the “Rigs-to-Reefs” programme, which required the spar to be laid down on its side on the seafloor.

Work was split between the original spar site at Garden Banks, block 876, in the Gulf of Mexico, at a depth of 5,200 ft., and the reefing site at Eugene Island, block 384, at a depth of 430 ft.

InterMoor developed the engineering procedures and performed the work to disconnect the mooring lines from the floating facility. The company also ballasted the hull prior to and during the topsides removal and deballasted it to prepare the hull for towing. Ballasting and deballasting were performed from a nearby derrick barge. The spar was then towed to the reefing site where it was flooded and laid on the seabed in a controlled manner. Finally, InterMoor recovered the mooring lines and assisted with the as-laid survey of the reefing site.

Dusan Curic , project manager at InterMoor, said, “Through thorough engineering and efficient offshore operations InterMoor enabled Anadarko to facilitate the safe and efficient removal of the platform. Multiple departments were involved – Project Management, Project Engineering, Advanced Analysis Group, Subsea Group, Operations, and Shore Base. We also managed multiple subcontractors throughout the project. InterMoor expanded its services to include ballasting and deballasting to allow for a more comprehensive life-of-field solution for its clients.”

The project represents InterMoor’s first work in ballasting and deballasting, and builds on the company’s growing decommissioning experience.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free