Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Jan De Nul Does Its Magic on Alstom’s Haliade Offshore Wind Turbine
Operations & Maintenance

October 30, 2014 · about 11 years ago

Jan De Nul Does Its Magic on Alstom’s Haliade Offshore Wind Turbine

In the North Sea, off the Belgian coast, Alstom has installed its first Haliade turbine within the Belwind facility. Jan De Nul Group earlier installed the rock scour protection around the jacket foundation of the turbine with its Fallpipe Vessel ‘Simon Stevin’. This time, the ‘Simon Stevin’ returne

2 minutes read
  • LinkedIn
  • X
  • Email

In the North Sea, off the Belgian coast, Alstom has installed its first Haliade turbine within the Belwind facility. Jan De Nul Group earlier installed the rock scour protection around the jacket foundation of the turbine with its Fallpipe Vessel ‘Simon Stevin’. This time, the ‘Simon Stevin’ returned to the wind farm to install a 33kV cable to connect the Haliade turbine to Belwind’s OHVS.

After having secured this array cable installation contract last spring, Jan De Nul Group immediately started the engineering and preparation works to ensure a fast and successful project completion.

The scope involved the installation of the 1,852 m array cable, CPU installation, post-trenching and scour protection.

For the project, the Simon Stevin was fitted with cable laying equipment on the aft deck, with a SMD CT1 jet trencher for the cable burial, launched from the vessels fall pipe moonpool, and with a Cougar XT to assist with the pull-in operations and for Touch Down Monitoring. Rock installation at the two crossings, as well as the OHVS and WTG was done using the vessel’s inclined fall pipe. This allowed the vessel to work in close proximity to these offshore structures as the rock had to cover the cable up to the entrance of the J-tubes.

As such Jan De Nul Group managed to complete the whole installation with a single vessel, reducing the interface risks and minimizing the costs for the Client.

[mappress mapid=”14605″]

Press release; Image: Jan De Nul

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 1 month ago

Illustration; Source: Vallourec
Business & Finance

French firm enters deal for bioenergy with CCS projects in Brazil

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 1 month ago
Illustration; Source: Vallourec
Business & Finance

French firm enters deal for bioenergy with CCS projects in Brazil

about 2 months ago