Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Van Oord to Replace Oil Export Line Off Gabon
Operations & Maintenance

November 10, 2014 · about 11 years ago

Van Oord to Replace Oil Export Line Off Gabon

Van Oord has been awarded the EPC contract for the replacement of a dual 10 km long oil export line. The client is Shell Gabon. The execution period runs from November 2014 to the summer of 2015. The export line runs from the Gamba terminal, 200 NM south of Port of Gentil, to a pipeline […]

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord has been awarded the EPC contract for the replacement of a dual 10 km long oil export line. The client is Shell Gabon.

The execution period runs from November 2014 to the summer of 2015. The export line runs from the Gamba terminal, 200 NM south of Port of Gentil, to a pipeline end manifold (PLEM).

The existing 30 inch line will be replaced by a looped dual 22 inch sea line system with pigging facilities allowing for inspection and cleaning.

Van Oord will deploy shallow water pipe lay barge Stingray.

The project contributes to Gabon’s export of energy and is important for the economic development in the region.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free