Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Project to Significantly Cut Offshore Transmission Costs
Business & Finance

November 25, 2014 · about 11 years ago

New Project to Significantly Cut Offshore Transmission Costs

As announced yesterday, Ofgem has awarded GBP 46.4 million for eight energy-related projects. Among them, a company running transmission assets of the Ormonde offshore wind farm proposes to develop an offshore cable repair vessel and universal cable jointing system in a way that would significantly

1 minutes read
  • LinkedIn
  • X
  • Email

As announced yesterday , Ofgem has awarded GBP 46.4 million for eight energy-related projects. Among them, a company running transmission assets of the Ormonde offshore wind farm proposes to develop an offshore cable repair vessel and universal cable jointing system in a way that would significantly reduce costs.

TC Ormonde OFTO Limited plans to convert an existing telecom-cable repair vessel so that it can also repair OFTO power cables, which are much larger and heavier than telecom cables and usually require non-coiling storage. This cable vessel would immediately become available to all transmission owners through the Atlantic Cable Maintenance Agreement (ACMA).

This would mean access to a vessel that is permanently on standby to undertake repairs at a price that is a small fraction of current offshore cable repair prices.

Furthermore, the company aims to manufacture and test a new universal cable jointing system which will allow dissimilar sections of OFTO-type subsea cable to be jointed together.

In addition, the project includes training and qualifying jointers to repair cables on board the new repair vessel using the new jointing system.

It is envisaged that the project will start by Q2 2015 and will be completed by Q2 2018 at the latest.

Global Marine Systems Ltd (GMSL) will act as prime contractor for the vessel modification, joint development work and jointer provision.

Source: Ofgem; Image: OWEC Tower AS (Ormonde offshore wind farm)

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceStorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago