Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›New Project to Significantly Cut Offshore Transmission Costs
Offshore Wind

November 25, 2014 · about 11 years ago

New Project to Significantly Cut Offshore Transmission Costs

As announced yesterday, Ofgem has awarded GBP 46.4 million for eight energy-related projects. Among them, a company running transmission assets of the Ormonde offshore wind farm proposes to develop an offshore cable repair vessel and universal cable jointing system in a way that would significantly

1 minutes read
  • LinkedIn
  • X
  • Email

As announced yesterday , Ofgem has awarded GBP 46.4 million for eight energy-related projects. Among them, a company running transmission assets of the Ormonde offshore wind farm proposes to develop an offshore cable repair vessel and universal cable jointing system in a way that would significantly reduce costs.

TC Ormonde OFTO Limited plans to convert an existing telecom-cable repair vessel so that it can also repair OFTO power cables, which are much larger and heavier than telecom cables and usually require non-coiling storage. This cable vessel would immediately become available to all transmission owners through the Atlantic Cable Maintenance Agreement (ACMA).

This would mean access to a vessel that is permanently on standby to undertake repairs at a price that is a small fraction of current offshore cable repair prices.

Furthermore, the company aims to manufacture and test a new universal cable jointing system which will allow dissimilar sections of OFTO-type subsea cable to be jointed together.

In addition, the project includes training and qualifying jointers to repair cables on board the new repair vessel using the new jointing system.

It is envisaged that the project will start by Q2 2015 and will be completed by Q2 2018 at the latest.

Global Marine Systems Ltd (GMSL) will act as prime contractor for the vessel modification, joint development work and jointer provision.

Source: Ofgem; Image: OWEC Tower AS (Ormonde offshore wind farm)

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & FinanceStorageTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free