Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Morpeth Flood Protection Scheme Finished
Business & Finance

December 25, 2014 · about 11 years ago

Morpeth Flood Protection Scheme Finished

This winter, Morpeth homes and business are better protected than ever from the threat of flooding from the River Wansbeck. Construction of new flood defenses in Morpeth town centre, as part of the multi-million pound flood alleviation scheme, is now complete. Since early 2013, contractors working o

2 minutes read
  • LinkedIn
  • X
  • Email

This winter, Morpeth homes and business are better protected than ever from the threat of flooding from the River Wansbeck.

Construction of new flood defenses in Morpeth town centre, as part of the multi-million pound flood alleviation scheme, is now complete.

Since early 2013, contractors working on behalf of the Environment Agency and Northumberland County Council have been constructing new defenses in the town and improving the existing ones. This has included work at High Stanners to build a new flood wall and embankment along the riverside area to tie in with Oldgate Bridge at one end, and Skinnery Bridge at the other.

Until the £27 million flood alleviation scheme began, residents of High Stanners had no protection against flooding. The new flood wall and 3 new flood gates that make up the flood defense is complete and water tight, and reduces the risk of flooding to homes and businesses in the lowest lying area of the town.

Other areas of the town with a reduced threat of flooding this winter are Crawford Terrace and Middle Greens, the areas around St George’s Church and St Robert’s Church, Pretoria Avenue and Mitford Road.

Flood protection for the whole town will be further improved when the upstream flood water storage is finished. This is expected to be in early 2015.

The upstream dam on the Mitford Estate, which is in its final stages of completion, will work by storing up to 1.4 million cubic meters of water when river levels on the Wansbeck are high and could cause flooding.

Press Release

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free