Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Technology›HZ Windpower Facility Assembles Its First 5MW Turbine
Technology

January 20, 2015 · about 11 years ago

HZ Windpower Facility Assembles Its First 5MW Turbine

The first turbine has been finished at the newly opened production facility in Rudong, Jiangsu province. Rudong Production Facility is a subsidiary of HZ Windpower, specialized in assembly of offshore wind turbine, it also performs warranty and O&M for onshore and offshore turbines in the area. The

1 minutes read
  • LinkedIn
  • X
  • Email

The first turbine has been finished at the newly opened production facility in Rudong, Jiangsu province.

Rudong Production Facility is a subsidiary of HZ Windpower, specialized in assembly of offshore wind turbine, it also performs warranty and O&M for onshore and offshore turbines in the area.

The facility has a capacity to deliver 100 HZ 5 MW offshore wind turbine annually, and will realize 1.2 billion CNY turnover this year, according to the company.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free