Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Keel Laid for Transnet’s New TSHD
Business & Finance

January 27, 2015 · about 11 years ago

Keel Laid for Transnet’s New TSHD

Royal IHC (IHC) has laid keel for South Africa’s Transnet National Ports Authority (TNPA) third 5,500m3 trailing suction hopper dredger. The keel-laying was held earlier this month at IHC’s Rotterdam yard with the TNPA’s general manager of corporate affairs, Lunga Ngcobo placing the coin under the h

2 minutes read
  • LinkedIn
  • X
  • Email

Royal IHC (IHC) has laid keel for South Africa’s Transnet National Ports Authority (TNPA) third 5,500m3 trailing suction hopper dredger.

The keel-laying was held earlier this month at IHC’s Rotterdam yard with the TNPA’s general manager of corporate affairs, Lunga Ngcobo placing the coin under the hull of the new dredger.

The new dredger will join TNPA’s existing fleet of IHC Merwede-built vessels which features the 4,200m3 TSHD ISANDLWANA (ordered in 2008) and the grab hopper dredger ITALENI (ordered in 2013).

According to the IHC, the new dredger will be equipped with the most advanced dredging technology available in the world today – the automation system (DCS or Dredge Control System) which is of the latest standards within IHC Systems including trail speed controller, Dredge track presentation system and ECO Pump Control. Same counts for the dredge pump which is of the latest generation of high efficient dredge pumps.

The dredger will have its own workboat, which is part of the contract. “As we are obliged to re-invest a certain amount of the contract price into sustainable job creation in South Africa (a so called Supplier Development plan) we have sub-contracted the workboat to a South Africa based ship builder, “ Royal IHC said in a statement.

Launching ceremony for the new vessel is set for May 9th this year with the delivery scheduled to take place in January 2016, a few months earlier than it was originally agreed.

Dredging Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago