Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Subsea to Launch New OWF Cabling Equipment
Business & Finance

February 10, 2015 · about 11 years ago

First Subsea to Launch New OWF Cabling Equipment

First Subsea will launch a new monopile interface connector for offshore wind monopiles and top tension connector for floating wind turbines on stand A-D8 at EWEA Offshore 2015. “First Subsea connector technology gives installation companies the ability to significantly reduce cable installation and

1 minutes read
  • LinkedIn
  • X
  • Email

First Subsea will launch a new monopile interface connector for offshore wind monopiles and top tension connector for floating wind turbines on stand A-D8 at EWEA Offshore 2015.

“First Subsea connector technology gives installation companies the ability to significantly reduce cable installation and mooring costs while improving the quality of these subsea connections,” says John Shaw, managing director, First Subsea .

First Subsea has streamlined the process of cable connection and termination with its combination of monopile interface connector (MIC) and hang off cable connector (HOC). The MIC secures the cable’s monopile connection while the HOC holds the pre-terminated cable in position on the hang-off deck ready for connection.

The company has also developed an innovative top tension connector for the deployment of wind farms further offshore at water depths in excess of 80m, where monopiles are considered impractical.

The top tension connector will allow the installation contractor to moor and tension a floating turbine’s mooring lines without the need for specialist tensioning equipment, and surface vessels requiring significant capex, that currently restricts the commercialisation of floating offshore wind farms. It uses a simple push and grip technology to connect mooring lines to a range of floating wind turbine platforms including tension leg platform, spar and semi-submersible.

Source: First Subsea

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceStorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago