Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Image of the day: Tocardo’s T1 turbine array
Operations & Maintenance

February 13, 2015 · about 11 years ago

Image of the day: Tocardo’s T1 turbine array

Tocardo’s array of three T1 tidal turbines being prepared for the installation in the morning of January 23, 2015. The array was deployed at the sluice gate of Afsluitdijk, Den Oever on the same day. The turbines can be uni or bi directional, and their capacity is 42 – 98 kW. The official opening is

1 minutes read
  • LinkedIn
  • X
  • Email

Tocardo’s array of three T1 tidal turbines being prepared for the installation in the morning of January 23, 2015.

The array was deployed at the sluice gate of Afsluitdijk, Den Oever on the same day.

The turbines can be uni or bi directional, and their capacity is 42 – 98 kW.

The official opening is scheduled for February 20.

Image: Tocardo

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free