Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›VIDEO: Drone footage of Sabella’s D10 assembly process
Operations & Maintenance

February 18, 2015 · about 11 years ago

VIDEO: Drone footage of Sabella’s D10 assembly process

Aerial footage of the assembly process of D10 tidal turbine that’s currently underway in the port of Brest. The base is 20 by 20 meters in size, and it will carry a turbine of 10 meters in diameter. The turbine will have the capacity of up to 1 MW. The deployment of the turbine is […]

1 minutes read
  • LinkedIn
  • X
  • Email

Aerial footage of the assembly process of D10 tidal turbine that’s currently underway in the port of Brest.

The base is 20 by 20 meters in size, and it will carry a turbine of 10 meters in diameter.

The turbine will have the capacity of up to 1 MW.

The deployment of the turbine is scheduled for April, 2015, in Fromveur Passage.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free