Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Ecosse Scopes Contract for £1.2 Bln Transmission Link
Storage

March 2, 2015 · about 11 years ago

Ecosse Scopes Contract for £1.2 Bln Transmission Link

Ecosse Subsea Systems (ESS) has signed a Letter of Intent with ABB for a seabed clearance and trenching project in the north of Scotland. The Aberdeenshire-based subsea technology firm will prepare the route for the 100-mile interconnector cable at the centre of SHE Transmission’s £1.2 billion Caith

1 minutes read
  • LinkedIn
  • X
  • Email

Ecosse Subsea Systems (ESS) has signed a Letter of Intent with ABB for a seabed clearance and trenching project in the north of Scotland.

The Aberdeenshire-based subsea technology firm will prepare the route for the 100-mile interconnector cable at the centre of SHE Transmission’s £1.2 billion Caithness-Moray transmission link project. Depending on the final scope and options selected, the contract will be ESS’s largest ever contract award.

When completed, the Caithness-Moray cable will be capable of carrying 1.2GW of renewable energy generated in the North of Scotland to the main UK electricity transmission network.

ESS will perform boulder clearance operations and pre-lay trenching prior to the laying of the transmission cable which will run from Spittal in Caithness to Blackhillock in Moray. Once the transmission cable is installed by main contractors ABB, ESS will complete back-fill operations to safely conceal and protect the cable.

ESS managing director, Mike Wilson, said: “Cable owners and manufacturers have recognised that our method reduces the risk of damage to the cable and our use of smaller charter vessels brings huge cost savings. We also reduce the possibility of schedule disruption because, working ahead of the laying phase, we can identify and help solve any potential engineering problems with the proposed seabed route before it reaches a critical point.”

Image: surepr

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago