Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Equipment›Grand Canyon II vessel ready for work
Equipment

March 24, 2015 · about 11 years ago

Grand Canyon II vessel ready for work

Norwegian Ship owner Volstad Maritime and shipbuilder Kleven last weekend held an open day and a naming ceremony for the Grand Canyon II Offshore Construction/ROV/IRM Vessel. The ceremony in Alesund, Norway, was witnessed by more than two thousand people. The 126-meters long vessel designed by Skips

1 minutes read
  • LinkedIn
  • X
  • Email

Norwegian Ship owner Volstad Maritime and shipbuilder Kleven last weekend held an open day and a naming ceremony for the Grand Canyon II Offshore Construction/ROV/IRM Vessel.

The ceremony in Alesund, Norway, was witnessed by more than two thousand people.

The 126-meters long vessel designed by Skipsteknisk can accommodate 104 persons. Apart from being equipped with a 250 t crane for subsea installation work, the vessel also has a swimming pool, libraries, saunas, gym and a cinema with 50 seats.

The Grand Canyon II is designed for operation under severe weather conditions with high maneuverability and station keeping capabilities. The vessel will work for Helix Energy Solutions group on a five-year charter.

Image: Martin Giskegjerde

Offshore Energy Today Staff

[mappress mapid=”1443″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free