Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›VolkerInfra, VBMS Win Burbo Bank Extension Job
Wind Farms

April 1, 2015 · about 11 years ago

VolkerInfra, VBMS Win Burbo Bank Extension Job

A joint venture comprising VolkerInfra and VBMS has been appointed by DONG Energy to execute the export cable landfall installation for Burbo Bank Extension offshore wind farm in Liverpool Bay. The works consist of two 600 meter duct installations, both intertidal and onshore, between Rhyl and Prest

1 minutes read
  • LinkedIn
  • X
  • Email

A joint venture comprising VolkerInfra and VBMS has been appointed by DONG Energy to execute the export cable landfall installation for Burbo Bank Extension offshore wind farm in Liverpool Bay.

The works consist of two 600 meter duct installations, both intertidal and onshore, between Rhyl and Prestatyn at the west coast of the UK. The joint venture will be executing the project by means of the trenchless Horizontal Directional Drilling (HDD) method. This offers a less invasive and disruptive solution to the local community than traditional open cut techniques.

Project manager Neil Gibbons said: “The joint venture sees specialist expertise being brought together by VolkerInfra and VBMS that have successfully worked together on several projects in the past. We are delighted that DONG Energy awarded this contract and look forward to showcasing our strong relationship and collaboration, to safely deliver this project.”

The first HDD activities will start in May 2015. The project is expected to be completed by the end of September 2015.

Earlier this month DONG Energy appointed VolkerInfra to install the 10km onshore cable circuit to connect the export cables from DONG Energy’s onshore substation to National Grid’s Bodelwyddan 400kV onshore substation.

Image: Dong Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free