Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Damen Completes Cable Innovator Outfitting
Operations & Maintenance

April 16, 2015 · about 11 years ago

Damen Completes Cable Innovator Outfitting

Global Marine Systems Limited’s vessel Cable Innovator has recently left Damen Shiprepair Dunkerque (part of Damen Shiprepair & Conversion) after extensive work including the installation of a ballast water treatment system and a 5-year survey. Cable Innovator is a multi-role vessel able to serve bo

2 minutes read
  • LinkedIn
  • X
  • Email

Global Marine Systems Limited’s vessel Cable Innovator has recently left Damen Shiprepair Dunkerque (part of Damen Shiprepair & Conversion) after extensive work including the installation of a ballast water treatment system and a 5-year survey.

Cable Innovator is a multi-role vessel able to serve both energy and telecommunications sectors as well as facilitate scientific research. “The vessel is unique,” said Damen Area Manager Edwin Ruppert . “She is one of the largest cable layers in the world and has a very good track record. In anticipation of the forthcoming IMO Ballast Water Convention, we have outfitted the vessel with a ballast water treatment system.”

“ We installed the ballast water system, with all its complex piping, into a very tight space, in a very short timeframe, ” explains Damen Shiprepair Dunkerque Project Manager Florent Longer .

To ensure this part of the work was completed on schedule, Damen cut a strategic entrance into the vessel’s hull to speed up the installation process.

Amongst the other work Damen carried out on the Cable Innovator were items required for the vessel’s 5-year survey. Amongst these was the blasting and repainting of the ballast water tanks, fresh water tanks and vessel undersides, the company informed.

Damen also removed, overhauled and reinstalled the vessel’s tail shaft, three tunnel thrusters and one azimuth thruster. “The removal and refitting of the shaft and thrusters involved a very quick turnaround. The teams were very well-led and performed excellently as a result, ” said Global Marine Superintendent Jeremy Lloyd .

[mappress mapid=”11786″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free