Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Gallery: Sabella D10 tidal turbine takes shape
Operations & Maintenance

April 17, 2015 · about 11 years ago

Gallery: Sabella D10 tidal turbine takes shape

Sabella’s D10 tidal turbine assembly process is nearing completion in the port of Brest, France. The assembly process began early in January 2015. The turbine’s power capacity is rated up to 1 MW. The base of Sabella’s D10 tidal device is 20 by 20 meters in size. It is 17 m high, and weighs 450 [&he

1 minutes read
  • LinkedIn
  • X
  • Email

Sabella’s D10 tidal turbine assembly process is nearing completion in the port of Brest, France.

The assembly process began early in January 2015.

The turbine’s power capacity is rated up to 1 MW.

The base of Sabella’s D10 tidal device is 20 by 20 meters in size. It is 17 m high, and weighs 450 tons. The turbine for the device is 10 m in diameter.

According to Sabella, D10 tidal turbine will be inaugurated in April, followed by the installation of the turbine in Fromveur Passage scheduled for June.

Once the installation is completed, the turbine will be connected to the Ushant island using MacArtney’s GreenLink connectivity solution.

[mappress mapid=”342″]

Images: Sabella

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free