Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Ichthys LNG raises first CPF, FPSO topside modules
Clean Fuel

April 22, 2015 · about 11 years ago

Ichthys LNG raises first CPF, FPSO topside modules

Ichthys LNG raises first CPF, FPSO topside modules

2 minutes read
  • LinkedIn
  • X
  • Email

The Inpex -operated Ichthys LNG project has lifted the first topside modules onto the hulls of its two ma jor offshore facilities.

The lifts mark the start of the topsides integration phase for the central processing facility and the floating production, storage and offloading facility, stands in the project’s statement.

This phase involves the hull and topsides for each facility coming together as single, connected structures for the first time – their components (or modules) having been fabricated separately.

Ichthys Project Managing Director Louis Bon said the CPF and FPSO topside module lifts, which are the first in a sequence, were a major step towards the completion of the two semi-submersible facilities.

“ These module lifts on our CPF and FPSO mark the start of the topsides integration phase for the Ichthys LNG project’s offshore facilities, which is a very important progression,” Bon said

The CPF and FPSO topsides include equipment required to safely and efficiently process, store and offload gas and condensate offshore from reservoirs in the Ichthys Field, as well as living quarters for the workforce on both facilities.

Gas and some condensate from the CPF will be sent through an 889 kilometre gas export pipeline to the project’s onshore LNG facilities in Darwin. Stabilised condensate from the FPSO will periodically be offloaded to shuttle carriers for export directly to market.

The combined weight of all topside modules for both facilities is about 120,000 tonnes, Ichthys LNG informed.

The first CPF topside module lift occurred on 15 April 2015. The module weighed about 3600 tonnes and was 50 metres long, 43 metres wide and 26 metres high.

The first FPSO topside module lift occurred on 20 April 2015. The module weighed about 2010 tonnes.

Once complete, the CPF and FPSO will be towed 5600 kilometres to the Ichthys Field in the Browse Basin, offshore Western Australia, where they will be moored permanently to the seabed for the life of the project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free