Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Triton Knoll Applies for Electrical System DCO
Offshore Wind

May 1, 2015 · about 11 years ago

Triton Knoll Applies for Electrical System DCO

Triton Knoll Offshore Wind Farm has submitted an application for a Development Consent Order (DCO) for the Triton Knoll Electrical System on 24 April 2015. “The application and associated documents will be reviewed by the Planning Inspectorate and we await confirmation that our application has been

1 minutes read
  • LinkedIn
  • X
  • Email

Triton Knoll Offshore Wind Farm has submitted an application for a Development Consent Order (DCO) for the Triton Knoll Electrical System on 24 April 2015.

“The application and associated documents will be reviewed by the Planning Inspectorate and we await confirmation that our application has been accepted,” said the company in a statement for Offshore WIND.

Following the statutory consultation on the Triton Knoll Electrical System (TKES) in Autumn 2014, a detailed consultation report has been prepared which includes responses to all the feedback.

“We are very grateful for all the comments received and where possible we have incorporated them into our application.”

As a result of these comments, and on-going discussions with stakeholders, a number of changes have been made to the project order limits including amendments to the offshore order limits based on feedback from aggregate dredging stakeholders and amendments to the onshore order limit.

Located approximately 32 kilometres off the coast of Lincolnshire the wind farm will comprise no more than 288 turbines with total capacity of up to 900MW.

It is estimated the wind farm will be able to produce enough electricity to power around 800,000 average UK households.

Triton Knoll offshore wind farm is jointly developed by RWE and Statkraft with the potential for a £3-£4bn investment and up to 1,900 UK jobs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindEnvironmentStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free