Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Work Starts on Westermeerwind’s Connection to Land
Storage

May 5, 2015 · about 11 years ago

Work Starts on Westermeerwind’s Connection to Land

The construction of the first electricity cable between the Westermeerwind offshore wind farm and the high voltage station being built within the dike in Espel began on May 1st. A total of six cables (up to 15 cm thick) will run under the dike through the tubes built last year. The construction of a

1 minutes read
  • LinkedIn
  • X
  • Email

The construction of the first electricity cable between the Westermeerwind offshore wind farm and the high voltage station being built within the dike in Espel began on May 1st.

A total of six cables (up to 15 cm thick) will run under the dike through the tubes built last year.

The construction of a total of 44 kilometers of cables between the wind turbines and land will take about two months.

From July, Westermeerwind’s wind turbines with towers will be placed on foundations, which were installed in March and April. It is expected that the first electricity will come ashore in August. After that, the testing and commissioning of the turbines will commence. The entire wind farm is scheduled to be ready by mid-February 2016.

Image: Westermeerwind

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago