Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Equipment›Cable Laying Begins at Kentish Flats Extension
Equipment

May 25, 2015 · about 11 years ago

Cable Laying Begins at Kentish Flats Extension

The work on the installation of foundations on Kentish Flats Extension project has been completed, and the cable laying has begun. The cables load out started on May 01 in Germany, and ‘Nostag 10’ vessel has already started the installation of the array cables at the site. The second vessel ‘Bodo In

1 minutes read
  • LinkedIn
  • X
  • Email

The work on the installation of foundations on Kentish Flats Extension project has been completed, and the cable laying has begun.

The cables load out started on May 01 in Germany, and ‘Nostag 10’ vessel has already started the installation of the array cables at the site.

The second vessel ‘Bodo Installer’ will install the export cables for the on Kentish Flats Extension.

The Kentish Flats Extension will have a maximum capacity of 49.5MW and will comprise of 15 turbines.

The extension itself will be capable of generating up to 173,000 megawatt hours (MWh) of clean electricity every year, which is equivalent to the total annual electricity needs of up to 35,000 UK households.

[mappress mapid=”11934″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free