Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Photo Update: New Sand for North Topsail Beach
Business & Finance

May 27, 2015 · about 11 years ago

Photo Update: New Sand for North Topsail Beach

The North Topsail Beach is moving forward with the Phase 5 of the Shoreline Protection Project. Construction works, undertaken by Norfolk Dredging Company, started in late 2014 near 3588 Island Drive with the aim to reach the Surf City line. Sand for this restoration project is being taken offshore

1 minutes read
  • LinkedIn
  • X
  • Email

The North Topsail Beach is moving forward with the Phase 5 of the Shoreline Protection Project.

Construction works, undertaken by Norfolk Dredging Company, started in late 2014 near 3588 Island Drive with the aim to reach the Surf City line. Sand for this restoration project is being taken offshore of North Topsail Beach and pumped onto the beach via pipeline.

During the project, approximately 1,500,000 CY of sand will be dredged and delivered to the beach.

The Town of North Topsail Beach yesterday announced that Norfolk Dredging is still in the Village of Stump Sound neighborhood (N & S Permuda Wynd) and is heading closer to the Surf City Campground. The beach is closed in Stump Sound and in front of Surf City Campground as they move south.

Check out the latest photos from the project:

[mappress mapid=”20562″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free