Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Sabella’s Underwater Power Link Installed
Storage

June 2, 2015 · about 11 years ago

Sabella’s Underwater Power Link Installed

The submarine electric cable that will link Sabella D10 tidal turbine to Ushant island’s power grid has been installed. The operation has been carried out between May 24th and 26th by BOURBON OFFSHORE SURF using the vessel L’Argonaute, a 69 meters long and 15 meters wide vessel usually used by Frenc

1 minutes read
  • LinkedIn
  • X
  • Email

The submarine electric cable that will link Sabella D10 tidal turbine to Ushant island’s power grid has been installed.

The operation has been carried out between May 24th and 26th by BOURBON OFFSHORE SURF using the vessel L’Argonaute , a 69 meters long and 15 meters wide vessel usually used by French Navy for State missions at sea.

BOURBON’s teams onshore and onboard have been assisted by IXSURVEY, IROISE MER, SCAPH’EUSA and FMGC.

The installation of the turbine is planned during neap tide at the end of June, using a heavy lift vessel operated by Combi Lift. This vessel will also carry out the connecion between the turbine and the power cable, allowing the turbine to export electricity to Ushant island.

Image: Sabella

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago