Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›ABB to Supply & Set Up Rampion’s Electrical Infrastructure
Wind Farms

June 3, 2015 · about 11 years ago

ABB to Supply & Set Up Rampion’s Electrical Infrastructure

ABB has won an order to provide substations and related power infrastructure for the Rampion Offshore Wind Farm. The company will provide power infrastructure for the offshore platform as well as the onshore substation to efficiently integrate the new wind farm into the country’s transmission grid.

2 minutes read
  • LinkedIn
  • X
  • Email

ABB has won an order to provide substations and related power infrastructure for the Rampion Offshore Wind Farm.

The company will provide power infrastructure for the offshore platform as well as the onshore substation to efficiently integrate the new wind farm into the country’s transmission grid. ABB will also extend an existing substation that will receive the wind power.

The wind farm is scheduled for completion in 2018.

The 400MW wind farm is being built by energy company E.ON, in partnership with the UK Green Investment Bank plc (GIB), off the Sussex coast between Worthing and Brighton and will include 116 turbines, with the nearest located 13 kilometers from shore.

As part of the order scope, ABB will be responsible for the turnkey delivery of the onshore substation, including high-voltage air-insulated switchgear (AIS), gas-insulated switchgear (GIS), transformers and substation automation as well as control and protection systems.

The onshore substation will also be equipped with four STATCOM (static compensator) units to ensure grid stability. These will provide reactive power compensation by detecting and instantly compensating for voltage fluctuations associated with the intermittent nature of wind energy.

ABB will also supply medium-voltage switchgear, power transformers and protection and control systems for the offshore platform as well as two new switchgear bays with control and protection equipment for the National Grid’s nearby substation at Bolney, receiving power from the new wind farm. The solution ensures that stringent grid code standards are met.

Image: ABB

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free