Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›PSA probes barrier management on ExxonMobil’s FPSO Balder
Fossil Energy

June 3, 2015 · about 11 years ago

PSA probes barrier management on ExxonMobil’s FPSO Balder

From 10 to 28 April, 2015, the Petroleum Safety Authority (PSA) Norway carried out an audit of ExxonMobil and the Balder floating, production, storage and offloading (FPSO) vessel. Balder field is located in the North Sea, approximately 190 km northwest of Stavanger. It is developed with a floating

1 minutes read
  • LinkedIn
  • X
  • Email

From 10 to 28 April, 2015, the Petroleum Safety Authority (PSA) Norway carried out an audit of ExxonMobil and the Balder floating, production, storage and offloading (FPSO) vessel.

Balder field is located in the North Sea, approximately 190 km northwest of Stavanger. It is developed with a floating production, storage, and offloading vessel (FPSO) and several subsea production systems.

According to the PSA, the objective of the audit was to assess how ExxonMobil is implementing and safeguarding compliance with the barrier and barrier management requirements in the domains of technical safety, process safety and flexible risers.

As a result of this audit, the PSA says that non-conformities were identified in connection with barrier management system, securing of valves and acceptance criteria and risk analyses.

In addition, improvement points were identified in connection with: The drainage system on the connector deck; The maintenance system; The emergency shutdown system; Passive fire protection of the gas emissions system; Fire water; and Documentation.

According to the regulator, ExxonMobil has been given a deadline of June 30, 2015 to report on how non-conformities and improvement points will be dealt with.

[mappress mapid=”1846″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free