Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›First Subsea Hires Jee Manager
Offshore Wind

June 4, 2015 · about 11 years ago

First Subsea Hires Jee Manager

First Subsea has hired Gary Howland to drive Renewables Connectors Business. Prior to joining Jee, Mr Howland was Vice President – Renewables at Trelleborg Offshore developing business in the global renewable energy sector, in particular offshore wind. Drawing on his recent experience in subsea cabl

1 minutes read
  • LinkedIn
  • X
  • Email

First Subsea has hired Gary Howland to drive Renewables Connectors Business.

Prior to joining Jee, Mr Howland was Vice President – Renewables at Trelleborg Offshore developing business in the global renewable energy sector, in particular offshore wind. Drawing on his recent experience in subsea cable engineering consultancy Gary Howland, commented, ”Cable installation is an area where there is scope for new connector technology offering by better engineering, and quicker and safer cable connections. First Subsea’s connectors offer all three.”

First Subsea has developed a range of cable and mooring systems designed to streamline cable installation and mooring of floating wind turbines. The Monopile Interface Connector (MIC) secures the cable’s monopile connection, while the Hang-Off Connector (HOC) holds the pre-terminated cable in position on the hang-off deck ready for connection.

First Subsea managing director John Shaw said: “Gary Howland’s appointment strengthens our sales and technical resource in line with our commitment to set the standard for wind turbine connectors.”

For the deployment of wind farms further offshore at water depths in excess of 80m, where monopiles are considered impractical, First Subsea has developed a top tension mooring line connector. The top tension connector allow the installation contractor to moor and tension a floating turbine’s mooring lines without the need for specialist tensioning equipment, and surface vessels requiring significant capex, that currently restricts the commercialisation of floating offshore wind farms.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free