Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›First steel cut for second Petronas FLNG
Vessels

June 16, 2015 · about 11 years ago

First steel cut for second Petronas FLNG

Malaysia’s oil and gas giant Petronas held an official steel cutting ceremony for its second floating liquefied natural gas facility at the Samsung Heavy Industries shipyard in Geoje Island, South Korea.

1 minutes read
  • LinkedIn
  • X
  • Email

Malaysia’s oil and gas giant Petronas held an official steel cutting ceremony for its second floating liquefied natural gas facility at the Samsung Heavy Industries shipyard in Geoje Island, South Korea.

“Petronas made a decision in January 2014 to make its final investment decision for the PFLNG2 project. The expectation is for PFLNG2 to embark on a technology solution to monetize a wider range of stranded gas fields when it is commissioned in 2018,” said Datuk Abdullah Karim, Vice President & Venture Director of LNG Projects – Domestic of Petronas .

The steel cutting, which took place on June 11, signifies the beginning of a mega construction phase of the hull and topsides of the PFLNG2 with a collective weight of 152,000 tons, Petronas said in a statement.

The second floating LNG facility for Petronas will make possible the liquefaction, production and offloading processing of natural gas in the Rotan field, 130 kilometers offshore Sabah, Malaysia.

PFLNG2 will have a capacity of 1.5 million tonnes per annum.

[mappress mapid=”17433″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

23 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

23 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

23 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

23 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

23 days ago