Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bladt, Semco Land Bligh Bank II Substation EPCI
Business & Finance

June 19, 2015 · about 11 years ago

Bladt, Semco Land Bligh Bank II Substation EPCI

Belgian wind farm developer Nobelwind has awarded Bladt Industries and Semco Maritime a new EPCI contract for the manufacturing of the Offshore Substation (OSS) for the upcoming Bligh Bank II Offshore Wind Farm. The substation is to be delivered in the fourth quarter of 2016, only 16 months after th

2 minutes read
  • LinkedIn
  • X
  • Email

Belgian wind farm developer Nobelwind has awarded Bladt Industries and Semco Maritime a new EPCI contract for the manufacturing of the Offshore Substation (OSS) for the upcoming Bligh Bank II Offshore Wind Farm.

The substation is to be delivered in the fourth quarter of 2016, only 16 months after the signing of the contract.

Bladt Industries will construct the Substation in close cooperation with their long term partners on manufacturing of substations, Semco Maritime, while ISC Consulting Engineers is responsible for the structural design.

The first phase of the project has already been initiated.

As the main contractor, Bladt Industries is responsible for the steel construction work at the top side of the substation as well as the overall engineering, procurement, construction and installation of the Substation.

“We believe that the keywords for our success within this field are knowledge, experience and cooperation. Not only cooperation between Bladt Industries and Semco Maritime, but also a very strong cooperation with our client,” says Jan Kjærsgaard , CEO, Bladt Industries.

Semco Maritime’s assignment includes design, onshore construction and offshore commissioning of the high voltage electrical systems and all other technical systems.

“Bladt and Semco form a strong team within this highly specialized field of engineering ensuring benefits for our client and businesses alike. We are seeing significant growth in the wind power segment these years, and the wind power business plays an increasingly important role for us,” says Steen Brødbæk , CEO, Semco Maritime.

The Bligh Bank II wind farm will be situated in the North Sea, 45 kilometers off the coast of Zeebrugge, Belgium. After completion, 50 wind turbines will provide a total output of 165 megawatts. The 1,100 tons substation converts the 33 kV voltage provided by the wind turbines into 220 kV voltage. The power is subsequently transported ashore via an already existing subsea cable shared with neighbour wind field North Wind, to which the Bladt/Semco-team supplied a substation last year.

Image: Bladt Industries/Semco Maritime

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free