Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Equipment›Saudi Aramco Breaks Subsea Cable Record on Safaniya
Equipment

June 29, 2015 · about 11 years ago

Saudi Aramco Breaks Subsea Cable Record on Safaniya

Saudi Aramco has achieved a landmark by energizing its largest Tie-in Platform with a 230 kilovolt 46 km submarine composite cable, “the longest of its kind”. The Tie-in Platform, named ‘TP-20’ lies in Safaniya offshore field, and energizing it was the first phase of long-term plans to upgrade the S

2 minutes read
  • LinkedIn
  • X
  • Email

Saudi Aramco has achieved a landmark by energizing its largest Tie-in Platform with a 230 kilovolt 46 km submarine composite cable, “the longest of its kind”.

The Tie-in Platform, named ‘TP-20’ lies in Safaniya offshore field, and energizing it was the first phase of long-term plans to upgrade the Safaniya offshore field, referred to as the Safaniya Master Plan, the company explained.

TP-20 will be the main crude oil gathering and power supply hub for North Safaniya offshore field. It is designed to provide 152 megawatts (MW) of electric power via a 46 km, 3-core 230 kV submarine composite cable (power and fiber) from a Saudi Electricity Company, newly-built 380/230 kV onshore substation.

According to Saudi Aramco, this 46 km, 3-core 230 kV submarine composite cable is the longest of its kind in the world and was installed as a single piece without a field splice.

The entire length of the submarine cable was transported from the manufacturer on a deep water cable laying vessel. Then, with the help of a shallow water cable laying barge, the cable was installed from onshore to offshore TP-20, the company said.

With the complete 230 kV electrical substation, the weight of TP-20 exceeds 6,000 metric tons. The installation of TP-20 was performed using a unique float-over method.

Subsequent to the energization of TP-20, TP-18 and the nine wellhead platforms in central Safaniya field were also successfully energized under the same project. TP-18 is designed to provide 62 MW of electric power being fed via a 44 km, 3-core 115 kV submarine composite cable from a newly -built 230/115 kV onshore substation.

A complete electrical power system is delivering power to Safaniya’s remote offshore loads and has increased crude oil production more than 70 MBOD from the central Safaniya field, Saudi Aramco concluded.

[mappress mapid=”12037″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free