Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Picture of the Day: Harper’s Slough Project
Business & Finance

July 8, 2015 · about 11 years ago

Picture of the Day: Harper’s Slough Project

Construction of islands in Harper’s Slough, located in Pool 9 of the Upper Mississippi River, is well underway. The work will span four construction seasons and is anticipated to be complete in 2018. A single construction contract was awarded in September 2014 and the remaining options exercised in

1 minutes read
  • LinkedIn
  • X
  • Email

Construction of islands in Harper’s Slough, located in Pool 9 of the Upper Mississippi River, is well underway.

The work will span four construction seasons and is anticipated to be complete in 2018.

A single construction contract was awarded in September 2014 and the remaining options exercised in October 2014 for a total construction cost of $11.9 million.

The proposed project will protect five existing islands and construct an additional seven islands using material from the backwater and main channel.

The scheme will slow the loss of existing islands, reduce the flow of sediment-laden water into the backwaters, reduce turbidity and increase the diversity of land and shoreline habitat.

This is the latest photo from the Harper’s Slough project, just published by the U.S. Army Corps of Engineers’ St. Paul District on their official facebook page.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free