Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Novatek’s natural gas production up in H1
Clean Fuel

July 9, 2015 · about 11 years ago

Novatek’s natural gas production up in H1

Novatek the operator of the Yamal LNG project reported its second quarter 2015 marketable production totaled 16.89 billion cubic meters of natural gas, an increase in natural gas production by 1.65 bcm, or by 10.8%.

2 minutes read
  • LinkedIn
  • X
  • Email

Novatek, the operator of the Yamal LNG project, reported its second quarter production totaled 16.89 billion cubic meters of natural gas, an increase in natural gas production by 1.65 bcm , or by 10.8%.

Besides natural gas, the company produced 2,198 thousand tons of liquids (gas condensate and crude oil) and reported an increase in combined liquids production by 818 thousand tons, or by 59.3% as compared with the second quarter 2014, the company informed in a statement.

In the first half 2015, marketable production totaled 33.04 bcm of natural gas and 4,189 thousand tons of liquids, resulting in an increase in natural gas production by 2.38 bcm, or by 7.8%, and an increase in liquids production by 1,447 thousand tons, or by 52.8% as compared with the first half 2014.

In the second quarter and first half 2015, Novatek processed 2,933 and 5,423 thousand tons, respectively, of unstable gas condensate at the Purovsky Processing Plant, representing an increase in processed volumes by 105.1% and 92.6%, as compared with the respective periods in 2014. Average daily throughput increased to 35.2 thousand tons in June 2015, which is 2.4 times higher as compared with June 2014.

In the second quarter and first half 2015, Novatek processed 1,741 and 3,440 thousand tons, respectively, of stable gas condensate at the Ust-Luga Fractionation and Transshipment Complex, which was 67.9% and 68.5% higher as compared with the respective periods in 2014.

At 30 June 2015, Novatek had 1,563 million cubic meters of natural gas and 684 thousand tons of stable gas condensate and petroleum products in storage or transit and recognized as inventory.

[mappress mapid=”17559″]

Image: Novatek

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free