Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›DolWin3 Platform Equipped with 2 Power Transformers
Storage

July 20, 2015 · about 11 years ago

DolWin3 Platform Equipped with 2 Power Transformers

Alstom and Nordic Yards have installed two 700 MVA power transformers on the DolWin3 converter platform based in the Warnemüde shipyard in Germany, operated by Nordic Yards. The transformers were designed and built by Alstom specifically for the DolWin3 converter project at its Mönchengladbach plant

1 minutes read
  • LinkedIn
  • X
  • Email

Alstom and Nordic Yards have installed two 700 MVA power transformers on the DolWin3 converter platform based in the Warnemüde shipyard in Germany, operated by Nordic Yards.

The transformers were designed and built by Alstom specifically for the DolWin3 converter project at its Mönchengladbach plant in Germany. During routine inspections, one transformer can continue to operate allowing the converter platform to transmit the energy generated uninterrupted.

“The 900 MW wind energy DolWin 3 is the most powerful and largest HVDC-converter platform built at Nordic Yards. In cooperation with Alstom and TenneT we are moving the German energy transition another step further,” said Herbert Aly, CEO of Nordic Yards .

“The two power transformers are core components of the DolWin 3 offshore converter platform. Today’s milestone further confirms our leadership in HVDC technology. This installation is the prerequisite for completion of the platform’s steel structure by Nordic Yards and the onward completion of the project,” said Gerhard Seyrling, Vice President Alstom Grid, Region Central & Eastern Europe and Russia .

In 2013, TenneT awarded DolWin3 contract to Alstom, to supply and construct both the onshore and offshore converter stations as well as the connecting cable systems for DolWin3. Alstom then contracted Nordic Yards to build and install the offshore converter platform.

The project is expected to be completed by 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

StorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

14 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

14 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

16 days ago