Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›VAALCO: Southeast Etame Development Well Online
Operations & Maintenance

July 20, 2015 · about 11 years ago

VAALCO: Southeast Etame Development Well Online

VAALCO Energy announced that the Southeast Etame 2-H well, the first development well drilled in the Southeast Etame Field, was brought online at the rate of approximately 3,400 barrels of oil per day (approximately 850 barrels per day net to VAALCO). The well was drilled to a measured depth of appr

2 minutes read
  • LinkedIn
  • X
  • Email

VAALCO Energy announced that the Southeast Etame 2-H well, the first development well drilled in the Southeast Etame Field, was brought online at the rate of approximately 3,400 barrels of oil per day (approximately 850 barrels per day net to VAALCO).

The well was drilled to a measured depth of approximately 14,012 feet, targeting a new reservoir that was discovered by an exploration well drilled by VAALCO in 2010. It is producing from the Gamba formation which is the source of all other VAALCO production in the Etame Marin permit area but the first production from this new, previously- unproduced field.

The Etame 2-H well is not producing any formation water or hydrogen sulfide (H2S), has a flowing tubing pressure of 1,080 PSI, and is producing at the lowest setting on the ESP (electrical submersible pump). The combination of reservoir pressure that is at original conditions, productivity equivalent to or greater than other nearby Gamba development wells and the low setting being utilized on the ESP confirm the strength of this well. VAALCO plans to continue to produce the well at the current rate to monitor wellhead and downhole pressure and to optimize fluid throughput at the recently commissioned production facilities on the platform.

This is the first well drilled and placed on production at VAALCO’s new Southeast Etame/North Tchibala (SEENT) platform that is located in approximately 260 feet of water offshore Gabon. VAALCO is the operator of the Etame Marin permit area and owns a 28.1% working interest.

The Transocean Constellation II jackup rig has been moved to a second slot on the same platform to drill the North Tchibala 1-H well that is targeting the Dentale formation in another previously-unproduced field (North Tchibala), that was discovered and delineated by prior wells but has not been placed on production.

Steve Guidry , VAALCO’s Chairman and CEO commented, “We are very pleased with the results of this first well to the new Southeast Etame field that we discovered in 2010 which have exceeded our expectations. While we believe the Etame 2-H well is capable of producing at even stronger rates, we are producing at these levels to optimize production and allow us to gather additional data about the productive capacity and extent of this previously un-tapped reservoir. We have already moved the rig and begun drilling the next well at the SEENT platform that will target the new North Tchibala Field and expect to have results from that well by late September.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free