Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›VBMS Repairs Defective Cable at Trianel Windpark Borkum Phase 2
Storage

July 22, 2015 · about 11 years ago

VBMS Repairs Defective Cable at Trianel Windpark Borkum Phase 2

VBMS has completed the repair of an inter-array cable at Trianel Windpark Borkum phase 2. The scope of work included the removal of the defective cable, and installation, burial, terminations and testing of a replacement cable which was completed in less than 48 hours, from arrival to departure. The

1 minutes read
  • LinkedIn
  • X
  • Email

VBMS has completed the repair of an inter-array cable at Trianel Windpark Borkum phase 2.

The scope of work included the removal of the defective cable, and installation, burial, terminations and testing of a replacement cable which was completed in less than 48 hours, from arrival to departure. The works were executed in the German Bight by cable-laying vessel Stemat Spirit.

VBMS CEO Arno van Poppel said: “We are very pleased that besides installation projects, we are partnering with more and more clients on repair projects. With this cable repair contract, both Trianel and the insurance companies have shown their confidence in VBMS as a total solutions provider.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago