Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›FERC approves Excelerate’s Aguirre Offshore GasPort
Vessels

July 28, 2015 · about 11 years ago

FERC approves Excelerate’s Aguirre Offshore GasPort

The Federal Energy Regulatory Commission (FERC) issued on Friday its order granting authorization to Excelerate Energy, in cooperation with the Puerto Rico Electric Power Authority (PREPA), to site, construct, and operate the proposed Aguirre Offshore GasPort project located offshore Puerto Rico. Th

1 minutes read
  • LinkedIn
  • X
  • Email

The Federal Energy Regulatory Commission (FERC) issued on Friday its order granting authorization to Excelerate Energy, in cooperation with the Puerto Rico Electric Power Authority (PREPA), to site, construct, and operate the proposed Aguirre Offshore GasPort project located offshore Puerto Rico.

The order confirms the final Environmental Impact Statement (EIS) that resulted in a finding of no significant environmental impact. As part of the order, the project will comply with all the environmental conditions outlined by FERC, Excelerate said in a statement issued on Monday.

The proposed project will be a floating liquefied natural gas terminal with the same capabilities as a land-based terminal. The terminal will consist of a floating storage and regasification unit (FSRU), minimal infrastructure to moor the vessel, and a subsea pipeline to deliver the gas onshore.

The facility will provide fuel to PREPA’s Central Aguirre Power Complex. Fuel cost reduction and environmental improvements, such as improved air quality and reduced barge traffic in the environmentally sensitive Jobos Bay, are the primary drivers for bringing the Project to Puerto Rico, according to Excelerate.

In the coming months, Excelerate said it will continue to work with FERC and cooperating agencies in preparation for the commencement of construction.

Construction is estimated to begin the first quarter of 2016, with an in-service date of the second quarter of 2017.

LNG World News Staff; Image: Excelerate Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

24 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

24 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

24 days ago