Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›CETO 5 array reaches 12.000 operating hours
Operations & Maintenance

July 31, 2015 · about 11 years ago

CETO 5 array reaches 12.000 operating hours

Carnegie Wave has announced that its CETO 5 wave energy array has reached 12.000 hours of cumulative, continuous operation at sea. The 720kW array featuring three CETO 5 units, deployed as part of Perth Wave Energy Project, has seen a wide range of sea states, including waves up to 5.7 m high since

2 minutes read
  • LinkedIn
  • X
  • Email

Carnegie Wave has announced that its CETO 5 wave energy array has reached 12.000 hours of cumulative, continuous operation at sea.

The 720kW array featuring three CETO 5 units , deployed as part of Perth Wave Energy Project, has seen a wide range of sea states, including waves up to 5.7 m high since the installation of the first unit in November, 2014.

The winter swells CETO 5 array is experiencing has enabled Carnegie’s plant operators and the analysis team to run real time optimisation strategies to understand the exact plant settings that will maximise power production for specific sea states.

The settings will become part of the system logic to be automatically selected when the same sea state is experienced in the future, according to Carnegie Wave.

The information gathered during winter on CETO 5 array will influence the design and future operation of CETO 6 units.

“This operational milestone is not only significant for Carnegie and the Perth Project, but for the wave energy industry as a whole, addressing the industry wide challenges around reliability and survivability. The Perth Project has been specifically designed to demonstrate survivability, maximise operational hours and confirm CETO 5 unit capacity. The operational results to date provide confidence that the performance of the CETO 5 system is meeting expectations,” it is stated in Carnegie Wave’s quarterly report.

As reported earlier, Carnegie retrieved the first CETO 5 unit for onshore maintenance and inspection.

According to Carnegie, the preparations are currently underway at Australian Marine Complex, located in Henderson, for redeployment of the first unit planned for the coming weeks, subject to suitable weather conditions.

Carnegie plans to retrieve the second CETO 5 unit and install the first unit in its place.

This will allow Carnegie to test unit interchangeability – a part of Carnegie’s ‘hot swap’ strategy where any unit can be swapped for another while the plant continues to operate.

Image: Carnegie Wave Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free