Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Video: Wheatstone LNG project more than 65 pct complete
Clean Fuel

August 3, 2015 · about 11 years ago

Video: Wheatstone LNG project more than 65 pct complete

Chevron’s US$29 billion Wheatstone liquefied natural gas project in Australia is more than 65 percent complete. The LNG Train 1 cold boxes have been delivered to the site located at Ashburton North, 12 kilometers west of Onslow in Western Australia, Chevron said in its latest update of the giant LNG

2 minutes read
  • LinkedIn
  • X
  • Email

Chevron’s US$29 billion Wheatstone liquefied natural gas project in Australia is more than 65 percent complete.

The LNG Train 1 cold boxes have been delivered to the site located at Ashburton North, 12 kilometers west of Onslow in Western Australia, Chevron said in its latest update of the giant LNG project.

They will play a central role in the gas liquefaction process, cooling the gas to -320°F (-160°C).

The slug catcher header and piping systems have also been installed, which will separate condensate from gas at the inlet of the plant before further gas processing.

At the Materials Offloading Facility, the breakwater is complete and the loading platform has been installed on the 1.2 kilometre (0.75 mile) product loading jetty, Chevron said.

At the offshore gas processing platform, 225 kilometres from Ashburton North, a 440-person accommodation vessel has been connected to the platform to support hookup and commissioning activities now under way.

Installation of subsea manifolds is complete and subsea equipment and flow lines are now being installed on the Wheatstone and Iago gas fields, Chevron added.

The Wheatstone project will consist of two LNG trains with a combined capacity of 8.9 million metric tons per annum and a domestic gas plant.

It is a joint venture between Australian subsidiaries of Chevron (64.14 percent), KUFPEC (13.4 percent), Woodside (13 percent), and Kyushu Electric (1.46 percent), together with PE Wheatstone, part owned by TEPCO (8 percent).

LNG World News Staff; Image: Chevron

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free