Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Meyer Turku: construction starts on Tallink LNG ferry
Vessels

August 4, 2015 · about 11 years ago

Meyer Turku: construction starts on Tallink LNG ferry

Meyer Werft’s Turku shipyard in Finland said it has started construction of Tallink’s LNG-powered fast ferry on Tuesday. The LNG ferry will be about 212 metres in length with a passenger capacity of 2800. It will cost around 230 million euros. The ship, which will operate on the route between Helsin

1 minutes read
  • LinkedIn
  • X
  • Email

Meyer Werft’s Turku shipyard in Finland said it has started construction of Tallink’s LNG-powered fast ferry on Tuesday.

The LNG ferry will be about 212 metres in length with a passenger capacity of 2800. It will cost around 230 million euros.

The ship, which will operate on the route between Helsinki and Tallinn, will be delivered in the beginning of 2017, Meyer Turku said in a statement.

Tallink’s new ‘environmentally friendly’ ship complies with the new and stricter emission regulations for the ECA areas including the Baltic Sea, it added.

LNG World News Staff; Image: Meyer Turku

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

24 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

24 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

24 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

24 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

24 days ago