Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Bibby HydroMap kicks off Port Meridian LNG survey job
Clean Fuel

August 24, 2015 · about 11 years ago

Bibby HydroMap kicks off Port Meridian LNG survey job

Seabed survey company Bibby HydroMap said it has begun survey operations on the proposed LNG project off Morecambe Bay.

1 minutes read
  • LinkedIn
  • X
  • Email

Seabed survey company Bibby HydroMap said it has begun survey operations on the proposed LNG project off Morecambe Bay.

The work includes geophysical, geotechnical and environmental surveying of the proposed pipeline route to shore and will be undertaken using a multi-vessel approach, the company said in a statement.

Bibby HydroMap’s own vessels Chartwell and Eagle will perform the geophysical and environmental scope, acquiring multibeam bathymetry, side scan sonar data, sub-bottom profiler and magnetometer data, alongside benthic grab samples and visual inspection. For the geotechnical aspect of the work, Bibby HydroMap will perform vibrocores to 5m and CPTs to 5m and 20m.

Located in Morecambe Bay, offshore Barrow-in-Furness, Port Meridian Energy is developing an LNG receiving and offloading facility designed to accommodate Höegh LNG’s FSRU vessels. Conventional LNG transportation vessels will offload LNG to the FSRU via ship-to-ship transfer; with the FSRU converting liquefied natural gas into a gaseous state suitable for transportation to shore via a subsea pipeline.

Transfer to shore comprises of a 26” diameter high-pressure gas pipeline, commencing at the FSRU location approximately 43½ km’s southwest of Barrow and landfalling on the western beach of Walney Island. From the landfall, the pipeline traverses approximately 5½ km’s through agricultural fields and crosses Walney Channel to the mainland to the site of the proposed Above Ground Installation where the gas will connect into the existing National Transmission System.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free