Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Statoil: Mariner jacket touches the seabed (VIDEO)
Fossil Energy

September 1, 2015 · about 11 years ago

Statoil: Mariner jacket touches the seabed (VIDEO)

The steel jacket for the Statoil-operated Mariner field on the UK Continental shelf (UKCS) has now been safely placed on the seabed in the field. After the sailaway from the Dragados Offshore yard in Cadiz, Spain on August 10, the Mariner jacket spent a week in the Boknafjorden near Stavanger, while

2 minutes read
  • LinkedIn
  • X
  • Email

The steel jacket for the Statoil-operated Mariner field on the UK Continental shelf (UKCS) has now been safely placed on the seabed in the field.

After the sailaway from the Dragados Offshore yard in Cadiz, Spain on August 10, the Mariner jacket spent a week in the Boknafjorden near Stavanger, while waiting for the heavy lift vessel Saipem 7000 to arrive at the field.

According to Statoil, “Skandi Iceman” vessel, towing the S44 barge with the jacket, and the heavy lift vessel were in place in the Mariner field, early on Sunday, August 30. The Mariner field is located around 150 kilometers east of Shetland.

Around 20.25 Sunday night, the jacket was launched from the barge, and early morning on Monday, it was hooked up to the cranes, upended and installed to its permanent location.

Statoil said that the tug “Boulder”, towing the Wagenburg 9 barge with the piles, is expected to arrive on the field Tuesday, September 1.

A total of 24 piles will be driven into the seabed to secure the platform jacket. Each pile is 65 meters long with a weight of 250 to 300 tonnes. The remaining installation activities are expected to continue for another 10-14 days.

Statoil claims that, with 134 meters high and a footprint of 88 x 62 meters, the Mariner sub structure is the largest steel jacket ever built for a Statoil project. The weight at load-out was 22,400 tonnes including floatation tanks and rigging.

Statoil is the operator of Mariner with 65.11% equity. Co-venturers are JX Nippon Exploration and Production (U.K.) Limited (28.89%) and Dyas UK Ltd. (6%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Hybrid electric propulsion at the heart of next-gen LNG carrier design
  2. 2Shell and MET Group pen new multi-year US LNG supply deal
  3. 3New US wave power test facility on Carnegie Clean Energy contender list for potential CETO demo
  4. 4Germany-UAE energy ties deepen as RWE, Masdar and ADNOC eye LNG supply and €3B offshore wind investment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free