Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kwai Tsing Dredging Continues
Business & Finance

September 7, 2015 · about 11 years ago

Kwai Tsing Dredging Continues

For a period of approximately 3 months, dredging operations will be carried at Kwai Tsing Container Terminals 7 and 9 North. The dredging will be performed by a grab dredger with two tug boats, four hopper barges and one motor survey boat assisting in the works, reported the Hong Kong Marine Departm

1 minutes read
  • LinkedIn
  • X
  • Email

For a period of approximately 3 months, dredging operations will be carried at Kwai Tsing Container Terminals 7 and 9 North.

The dredging will be performed by a grab dredger with two tug boats, four hopper barges and one motor survey boat assisting in the works, reported the Hong Kong Marine Department (MARDEP).

According to the notice, the number of vessels engaged in the works will change from time to time to suit operational requirements. A working area of approximately 50 meters around the grab dredger will be established.

The project continues previously completed dredging of the container terminals 1, 2, 4 and 5.

The dredging of the seabed of the Kwai Tsing terminals will provide sufficient depth in the container basin and approach channel for the safe navigation of the new generation of ultra large container ships.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free