Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Research & Development›Two-Bladed Turbine to Be Tested in Eemshaven
Research & Development

September 21, 2015 · about 11 years ago

Two-Bladed Turbine to Be Tested in Eemshaven

An offshore wind turbine with a capacity of 6MW will be installed and tested in Eemshaven. The 2B6 turbine uses two instead of three blades, which are mounted on the rear side of the turbine (downwind). The turbine is expected to power to 5,000 households within a period of 15 years. The aim of the

1 minutes read
  • LinkedIn
  • X
  • Email

An offshore wind turbine with a capacity of 6MW will be installed and tested in Eemshaven.

The 2B6 turbine uses two instead of three blades, which are mounted on the rear side of the turbine (downwind). The turbine is expected to power to 5,000 households within a period of 15 years.

The aim of the project is to demonstrate that the 2B6 turbine, developed by 2-B Energy, is able to reduce production costs for offshore wind energy by using fewer components and the applying innovative installation techniques. It is envisaged that in future use at sea, the new wind turbine will lead to using fewer vessels and lifting movements, thus reducing costs as well as the environmental impact.

Pondera Consult was in charge of acquiring the license for this project.

Offshore WIND Staff; Image: 2-B Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free