Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›BOEM Studies Offshore Wind Construction
Authorities & Government

September 29, 2015 · about 11 years ago

BOEM Studies Offshore Wind Construction

The U.S. Bureau of Ocean Energy Management (BOEM) has begun a new study to conduct real-time, independent observations and data collection during construction of offshore wind turbines. Field work took place in August and September of this year through the Real-time Opportunity for Development Envir

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Bureau of Ocean Energy Management (BOEM) has begun a new study to conduct real-time, independent observations and data collection during construction of offshore wind turbines.

Field work took place in August and September of this year through the Real-time Opportunity for Development Environmental Observations study, or RODEO, which is taking direct measurements of visual effects, sound produced by various activities, and seafloor disturbances caused by cabling or anchoring. It is also evaluating different types of monitoring equipment.

Beginning with Rhode Island’s Block Island project, the study will be ongoing during the next five years and will take measurements from projects as they come online. Field work at future projects may include evaluation of air emissions and testing of mitigation measures. These monitoring efforts could take place in state or federal waters.

RODEO offers a new opportunity to learn from data gathered from actual construction instead of best-guess scenarios, and will help BOEM establish realistic mitigation measures that reduce or eliminate impacts. The offshore wind energy industry will benefit by having appropriate mitigation measures based on real data to ensure the marine environment is protected in a cost-effective manner.

For offshore wind development, there is no previous experience in the United States, so the analyses and subsequent mitigation measures are based on the best available science. Future analyses will benefit from real-time, independent observations during actual construction activities.

For example, the extent of disturbance on the seafloor from anchors may be estimated to encompass a larger area than actually occurs. Recovery from the disturbance may occur in less than a year or may take longer. Vessels may use dynamic positioning, resulting in no disturbance from anchoring.

The first component completed for this study was development of a field plan for measurements at the Block Island Wind Farm (BIWF) during the installation of the foundations. The second task involves the testing of scour monitoring equipment on one foundation at BIWF for up to one year. The third task has researchers recording activities as they occur, monitoring sound in air and water during pile driving, and evaluating scour from anchors and other bottom disturbing activities.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

21 days ago

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

21 days ago
Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

22 days ago