Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›FERC set to ready EIS for Louisiana LNG Energy’s project
Clean Fuel

October 2, 2015 · about 11 years ago

FERC set to ready EIS for Louisiana LNG Energy’s project

The United States Federal Energy Regulatory Commission issued a supplemental notice of intent to prepare an environmental impact statement for Louisiana LNG Energy’s proposed export project.

2 minutes read
  • LinkedIn
  • X
  • Email

The United States Federal Energy Regulatory Commission issued a supplemental notice of intent to prepare an environmental impact statement for Louisiana LNG Energy’s proposed export project.

According to FERC’s filing, the commission intends to review proposed changes to the original plans of Louisiana LNG Energy to construct a liquefied natural gas export terminal on the east bank of the Mississippi River in Plaquemines Parish, Louisiana.

Following new ownership and additional environmental and engineering analysis, Louisiana LNG Energy intends to increase the production capacity to 6.0 million tons per annum from the initial 2.0 mtpa and increase the storage capacity of the LNG storage tanks to 140,000 cbm from 100,000 cbm.

Other changes to the proposed project include the increase of the northern pipeline from the 1.9-mile 24-inch-diameter to 1.9-mile 36-inch-diameter with an associated meter station that would deliver gas from the Tennessee Gas interstate pipeline system. The company also intends to increase the southern pipeline from the 1.6-mile 12-inch-diameter to 3.5-mile 36-inch-diameter that would deliver gas from the Tennessee Gas Pipeline system to the facility.

However, Louisiana LNG Energy intends to eliminate the truck loading facility and the compressor station from the initial project design.

Bechtel has been selected to provide all engineering and design support, and Chart Industries has been selected as the technology provider.

The company expects to submit a formal application with FERC in early 2016.

[mappress mapid=”17766″]

LNG World News Staff; Image: Louisiana LNG Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free