Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Energinet.dk to Start Anholt Cable Replacement
Operations & Maintenance

October 15, 2015 · about 11 years ago

Energinet.dk to Start Anholt Cable Replacement

Energinet.dk plans to start the replacement of two sections of the cable that connects the Anholt offshore wind farm to the grid in the period between October 26 and November 23, depending on weather conditions. In February, the company discovered an error in the submarine cable that connects the An

1 minutes read
  • LinkedIn
  • X
  • Email

Energinet.dk plans to start the replacement of two sections of the cable that connects the Anholt offshore wind farm to the grid in the period between October 26 and November 23, depending on weather conditions.

In February, the company discovered an error in the submarine cable that connects the Anholt offshore wind farm to the grid on land.

Energinet.dk with the supplier, NKT Cables, and the help of an external test laboratory analyzed the error on the cable, and decided to replace parts of the submarine cable which analyzes indicated a risk that there may be errors.

The results indicated that there is a risk of error in the first 400 meters of the submarine cable from Grenå and the last 4 km before the substation.

While the repair is underway, the island of Anholt will be powered from the its own diesel generators.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free