Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›NPD nods for start-up of two pipelines
Fossil Energy

November 6, 2015 · about 11 years ago

NPD nods for start-up of two pipelines

The Norwegian Petroleum Directorate (NPD) has granted start-up consents for the Edvard Grieg oil pipeline and the Utsira High gas pipeline. These transport solutions will become part of the development of the Edvard Grieg and Ivar Aasen fields on the Utsira High in the North Sea. According to the di

2 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian Petroleum Directorate (NPD) has granted start-up consents for the Edvard Grieg oil pipeline and the Utsira High gas pipeline.

These transport solutions will become part of the development of the Edvard Grieg and Ivar Aasen fields on the Utsira High in the North Sea. According to the directorate, start-up of the Edvard Grieg field is planned towards the end of 2015, whereas the planned start-up of Ivar Aasen is scheduled for next year. Ivar Aasen will use both pipeline systems.

The oil transport system includes a 43-kilometre long 28-inch pipeline between the Edvard Grieg platform and a new Y-connection point, which has been installed on the Grane oil pipeline about 4 kilometres from Grane.

The gas transport system includes a 94-kilometre long 16-inch pipeline from the Edvard Grieg platform to an underwater connection point (T-connection) on the Beryl pipeline. This, in turn, is connected to the Scottish Area Gas Evacuation (SAGE) pipeline in the UK sector.

The licensees for the two transport systems are the same as for Edvard Grieg and Ivar Aasen. Statoil has been the operator of both transport systems since Plan for Installation and Operation (PIO) was approved in 2014. Gassco will take over as operator of the Utsira High gas pipeline when it comes on stream.

The two transport systems have both been delivered according to schedule, the NPD said. In addition, investments for both have been lower than projected in the PIO.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SED Energy Holdings and Ventura Offshore to unite into one
  2. 2New Boskalis rock installation vessel starts work offshore Poland
  3. 321 companies apply for Norway’s new oil & gas exploration areas
  4. 4Spanish shipyard launches its largest-ever vessel, built for Østensjø Rederi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free