Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Gallery: bioWAVE deployment process
Operations & Maintenance

December 18, 2015 · about 10 years ago

Gallery: bioWAVE deployment process

BioPower Systems, an Australian wave energy developer, completed the installation of its bioWAVE unit this week as part of Port Fairy Wave Energy Project.

1 minutes read
  • LinkedIn
  • X
  • Email

Photos: BioPower Systems

BioPower Systems, an Australian wave energy developer, completed the installation of its bioWAVE unit this week as part of Port Fairy Wave Energy Project.

The 250 kW pilot bioWAVE unit design was inspired by undersea plants.

It is a 26 m tall oscillating structure designed to sway back-and-forth beneath the ocean swell through an arc of up to 40 degrees.

This oscillating motion activates opposing hydraulic cylinders, and the pressurised hydraulic fluid spins a 250kW generator to produce electricity.

The electricity is then fed into the grid via an undersea cable. bioWAVE was installed off Port Fairy, Victoria, Australia.

The device is expected to operate for a 12-month period before being decommissioned. According to BioPower, periodic maintenance and testing will be carried out during the operating period, resulting in an independent assessment of the bioWAVE performance.

The Au$21 million (~$15 million) project is expected to provide key data for the design of a larger 1 MW commercial-scale bioWAVE unit, which is planned as the next phase of development of the technology.

[mappress mapid=”750″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenanceResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free