Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Jordan’s NEPCO resumes full operations at LNG import terminal
Vessels

December 18, 2015 · about 10 years ago

Jordan’s NEPCO resumes full operations at LNG import terminal

National Electric Power Company of Jordan informed that following disruptions earlier in the month its LNG import terminal is operating at full capacity.

1 minutes read
  • LinkedIn
  • X
  • Email

National Electric Power Company of Jordan informed that following disruptions earlier in the month its LNG import terminal is operating at full capacity.

Bad weather conditions forced NEPCO to declare force majeure on the terminal at the beginning of December as strong winds required the FSRU Golar Eskimo to move away from the jetty, Reuters reports.

This caused a disruption in gas supplies in Jordan and Egypt.

Capable of storing 160,000 cubic metres of LNG and delivering up to 500 mmscfd with a peaking capacity of 750 mmscfd, the FSRU delivers the fuel to power plants throughout the country and also to the Egyptian Natural Gas Holding (EGAS) via a pipeline.

Gas flows restarted at half capacity following a few off days before returning to full capacity.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

25 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

25 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

25 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

25 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

25 days ago